Describe the work or paste in a job outline to draft a detailed quote with labor and material line items. Set your own rates, review and edit the quote, and send it to your customer. When a customer accepts, TradesArrow creates a linked job with the quote details. Add the quote’s materials to a purchasing list, or create a matching invoice.
Inside the product
Real TradesArrow screens automatically rotate below. Use the arrows or dots to explore at your own pace.
Build detailed, professional quotes without starting from scratch.
Screenshot 1 of 1
TradesArrow
Active
3
Total value
$23.9k
Accepted
$12.9k
QR-0088
Kitchen Backsplash
Sarah Mitchell
$2,589.50
QR-0087
Primary Bath Remodel
Dave Kowalski
$8,420.00
QR-0086
Exterior Paint
Greenview Property
$12,900.00
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Qty
Unit price
Type
Draft details · 94% confidence
Assumptions to confirm
Site protection & prep
Labor
Qty
1
Unit price
$150.00
Total
$150.00
Existing backsplash demolition
Labor
Qty
1
Unit price
$350.00
Total
$350.00
Substrate/drywall repair & prep
Labor
Qty
1
Unit price
$200.00
Total
$200.00
Layout & precision cuts
Labor
Qty
1
Unit price
$250.00
Total
$250.00
Tile installation (40 SQFT)
Labor
Qty
40
Unit price
$18.00
Total
$720.00
Grout & finish (40 SQFT)
Labor
Qty
40
Unit price
$4.00
Total
$160.00
Cleanup/final inspection
Labor
Qty
1
Unit price
$100.00
Total
$100.00
White subway tile w/ waste factor
Material
Qty
45
Unit price
$8.50
Total
$382.50
Thinset mortar
Material
Qty
2
Unit price
$25.00
Total
$50.00
Premium Grout
Material
Qty
1
Unit price
$45.00
Total
$45.00
Leveling spacers/clips
Material
Qty
1
Unit price
$35.00
Total
$35.00
Metal edge trim
Material
Qty
4
Unit price
$18.00
Total
$72.00
Backer/patch materials
Material
Qty
1
Unit price
$40.00
Total
$40.00
Sealant/protection supplies
Material
Qty
1
Unit price
$35.00
Total
$35.00
555-0199 • contact@elevatedinstalls.com
123 Main Street
City, State 12345
QR-0088
Customer: Sarah MitchellJob: Tile InstallationStatus: DraftDate: Oct 15, 2023
Estimate includes removal of existing tile and installation of new white subway tile per customer request. Labor rates standard. Valid for 30 days.
Add labor and material line items. The total calculates automatically.
Accepting a quote instantly creates a matching job with all the details already filled in.
Arrow Quote Builder is one piece of a connected system that runs your whole operation — customers, jobs, quotes, invoices, calendar, and your team all in one place. No more switching apps or losing data.
Start your 1-month free trial. No credit card, no setup fees — get your team running in minutes.